Unjustified Mechanic’s Lien Cannot Support Defamation Claim

Mechanic’s liens, if available, can be useful tools for unpaid contractors, subcontractors and suppliers to get paid for their work. Like any tool, it is subject to abuse; such as by the filing of an unwarranted, or exaggerated, lien.  While there is a statutory remedy in those cases where the lien is shown to be willfully exaggerated, such remedy is only available where the lienor actually seeks to foreclose on the lien in court.

Where there is no lien foreclosure action, what is a contractor-lienee, aggrieved by the filing of an allegedly exaggerated lien, to do? In the recent case of Centrifugal Associates Group LLC v Newell Contracting, Inc., a court showed us what cannot be done: extend liability for the claimed misuse of a mechanic’s lien to the principal of the subcontractor-lienor on a theory of defamation.

Background

Centrifugal Associates Group LLC, was hired by the Durst Organization to serve as the general contractor on a construction project on 26th Avenue in Queens. Centrifugal, in turn, hired Newell Contracting, Inc. as a subcontractor to perform certain mechanical work. Newell performed work under the contract and claimed that it wasn’t being paid. On September 17, 2018, Newell filed a mechanic’s lien against Durst’s property in the amount of $320,000, claiming that it was owed that amount by Centrifugal, as GC. Newell, however, never sought to foreclose the lien.  Centrifugal disputed the debt.

On November 26, 2018, Centrifugal commenced a lawsuit against Newell and its president, Krzysztof Bielak. Centrifugal’s claims against Newell were for the claimed breach of the subcontract, for which Centrifugal sought damages in excess of $8 million. As to Bielak, Centrifugal claimed that his statements made in the mechanic’s liens were false because no money was owed to Newell, and that Bielak caused the mechanic’s lien to be filed solely to cause harm to Centrifugal (and that the resulting harm was the removal of Centrifugal from Durst’s approved contractors list).

Both Newell and Bielak failed to answer the complaint, and Centrifugal sought a default judgment against both. Newell did not oppose the motion, but Bielak did—and also cross moved to dismiss the claims against him. In support of his motion, Bielak argued that he could not be held liable for acts undertaken in his corporate capacity and, regardless, the statements made in a mechanic’s lien are not actionable as defamation, as a matter of law.

Decision

The court first dispatched Bielak’s corporate capacity argument, citing to well established case law providing that an individual can be personally liable for a tort committed in a corporate capacity (as opposed to a breach of contract, which would not support personal liability). However, the court was more receptive to Bielak’s argument that he did not commit defamation as a result of filing the mechanic’s lien. New York recognizes certain privileged situations where a person can undertake what may otherwise be considered defamation with impunity. One such privilege involves statements made in the course of a judicial proceeding. As a mechanic’s lien is pertinent to a lien foreclosure action, the court held, the statements could not be considered defamation, as a matter of law. In that regard, the court granted Bielak’s motion and dismissed the defamation claim against him.

Comment

As can be seen from the court’s holding in Centrifugal, the remedies against a lienor whose lien is exaggerated are limited, outside of the foreclosure context. However, as the court tangentially referenced, those remedies are not nonexistent and may include claims for fraud, disparagement of title, interference with contract, interference with prospective business advantage, extortion, malicious prosecution and malicious abuse of process. Accordingly, although Centrifugal stands for the proposition that a lienor’s principal cannot be held liable on a defamation theory, there is other recourse available to the target of the improper mechanic’s lien—even if the lienor refrains from foreclosing. In that regard, contractors should take away the importance of always being accurate and truthful when filing a mechanic’s lien.

Subcontractor Subject to Claim to Enforce Private Bid

Prime contractors are generally aware that by statute, bids submitted on public works projects are, absent narrow circumstances, firm and must be honored. Accordingly, upon being notified that its bid was the lowest bid (and upon being awarded the project), the low bidding contractor must enter into a contract with the municipality for the project. The form of contract is usually included in the bid form documents. So, if the contractor sees something objectionable in the contract, it can simply decline to submit a bid (but not negotiate the terms).

Bids on private jobs, on the other hand, are not necessarily firm. One tool that can be used to make a private bid firm is the quasi-contractual theory of promissory estoppel, which provides that a party who is the recipient of a promise and relies on that promise to its detriment can sue for damages arising out of a breach of that promise. In the recent case of Andrew R. Mancini Associates, Inc. v. Murphy Excavating Corp., an appellate court held that there were questions of fact as to whether a bid submitted to a general contractor by a subcontractor was firm—and whether the subcontractor could be held liable for the difference between its bid and the higher cost actually incurred by the general contractor to retain a different subcontractor after the original subcontractor refused to enter into a contract upon its bid.

Background

In December of 2016, in preparing to submit its own bid to serve as the general contractor on a reconstruction project, Andrew R. Mancini Associates solicited bids from subcontractors to perform, amongst other tasks, the excavation and landscaping scopes of work. Murphy Excavating Corp. submitted a bid to Mancini for such work, and Mancini confirmed both Murphy’s price and the scopes of work to be performed. Murphy was aware that its bid was being incorporated into Mancini’s own bid to the project’s owner.

The following month, Mancini informed Murphy that Mancini had been awarded the project, and both parties began to negotiate the form of the subcontract. Ultimately, these negotiations broke down over what Murphy characterized as “unreasonable” terms in Mancini’s proposed subcontract, and Murphy refused to enter into an agreement with Mancini. In light of Murphy’s refusal, Mancini procured the required services from another subcontractor, but at a higher cost. Mancini sued Murphy on the theory of promissory estoppel to recoup the difference between Murphy’s bid price and the higher price it ultimately paid for the work. Murphy moved for summary judgment, asking the court to dismiss the claim.

Decision

The trial court denied Murphy’s motion, and the appellate court affirmed the trial court’s decision. In doing so, the appellate court cited to well established case law holding that a claim for promissory estoppel is stated when a plaintiff alleges that a defendant made a clear and unambiguous promise, that the plaintiff relied upon that promise to its detriment, and that the plaintiff was harmed as a result of the breach of the promise. Relying upon that case law, the appellate court affirmed the trial court’s finding that there were questions of fact as to whether Murphy’s promise was unambiguous, and whether Mancini’s proposed contract was reasonable. The court also cited to case law providing that what occurred during the failed negotiation of the subcontract—which could determine whether the promise was actually breached—is similarly an issue of fact for a jury.

Comment

The ramifications of submitting a bid as a prime contractor in the public works context are well known. In the private context, however, the effects are less well settled. Under some circumstances, courts have indicated willingness to use the doctrine of promissory estoppel to make those bids firm. Courts have also indicated that where the circumstances are not clear, such as in Murphy Excavating, the parties will have to proceed through expensive discovery to an (even more) expensive trial. In order to avoid such vagaries, contractors submitting private bids would be well advised to indicate clearly what conditions those bids are subject to, and under what terms and conditions the bid will—or will not—be honored. Better yet, contractors can make the form of the subcontract part of their bid packages so that such an argument over the exact terms of that subcontract can be had before the bid, and not after.

Contractor Liable to Sub for Failing to Protect Sub’s Claim Against Owner

A subcontractor has no direct contractual relationship with a project owner; that relationship is between the general contractor and the owner.  Accordingly, the sub cannot sue the owner directly, even if it sustains monetary damages caused by the owner.  Consequently, in response to this lack of contractual privity, the sub and the GC may enter into a liquidating, or pass-through, agreement, where the sub assigns its claim to the GC. The GC, in turn, prosecutes the sub’s passed-through claim against the owner, and then gives the sub any recovery.

Generally, a liquidating agreement is designed to limit, or liquidate, the GC’s liability to the sub to the amount the GC recovers from the owner. However, in order for the GC to limit that liability, it must pursue the sub’s claim in good faith. In the recent decision in the case of Rad and D’Aprile, Inc. v. Arnell Construction Corp., which was rendered by the trial court after remand from the appellate court decision discussed in the May, 2018, Attorneys’ Column, the court found that the GC had breached its duty of good faith and fair dealing under its liquidating agreement and, therefore, was directly liable to the sub for claims that ought to have been pursued against the owner.

Background

In June of 2001, the New York City Department of Sanitation entered into a contract with Arnell Construction Corp., as GC, to construct two new sanitation garages in Brooklyn. Arnell’s contract with the City required that any claims against the City be brought within six months of the City’s issuance of the certificate of substantial completion. In August of 2001, Arnell subcontracted with Rad & D’Aprile, Inc., for Rad to perform masonry work on the project.

In August of 2010, pursuant to a liquidating agreement it had entered into with Rad, Arnell filed a notice of claim with the City seeking damages on behalf of Rad for additional costs that Rad incurred due to various delays caused by the City. In December of 2010, Arnell sued the City on those claims.  The City moved to dismiss the lawsuit on the ground that it was untimely under the six-month limitations period provided for in Arnell’s contract. In May of 2012, the court dismissed Arnell’s lawsuit, finding that the City had notified Arnell in December of 2007 that the project was substantially complete, and that any lawsuit had to be commenced no later than June of 2008. Arnell filed an appeal and also moved to reargue the motion. Unbeknownst to Rad, while the appeal and motion to reargue were pending, Arnell settled with the City for $3,638,495.69. None of the settlement money was apportioned on account of Rad’s claim, but Arnell nonetheless released Rad’s claim in the settlement.

After that lawsuit was dismissed (and the secret settlement consummated), Rad sued Arnell directly for the same damages, alleging that Arnell had a duty to make a good-faith, diligent effort to prosecute Rad’s claim against the City, and that Arnell breached that duty by failing to commence the lawsuit against the City within the applicable six-month limitations period. Arnell moved to dismiss this claim but the trial court denied the motion, finding that the claim, as stated, was sufficient because Rad set forth facts which, if proven, would establish that Arnell had a duty of good faith and fair dealing independent of the subcontract, and that Arnell breached that duty by failing to commence the underlying action before the six-month limitations period expired. After the trial court’s order was upheld on appeal, Rad moved for summary judgment on its breach of the covenant of good faith and fair dealing claim, asserting that the facts of the undisclosed settlement, coupled with Arnell’s waiver of Rad’s claim in exchange for a recovery limited to its own claims, established that Arnell breached the covenant and should be held directly liable to Rad.

Decision

The trial court granted summary judgment to Rad, finding that the liquidating agreement was an express agreement for Arnell to be responsible for delays caused by the City, and that Arnell’s self-serving actions in failing to inform Rad of the settlement, and in releasing Rad’s claim in order to obtain payment on the contract-balance portions of its own claim, established that Arnell, in fact, breached the covenant of good faith and fair dealing, and that Arnell could not raise an issue of fact as to whether it diligently presented Rad’s claim sufficient to defeat summary judgment.

As to the extent of the claim, Arnell argued that as none of the monies recovered were on account of Rad’s claim, it could not be held liable to Rad under the liquidating agreement. The court dismissed such argument, finding that the fact that no money was recovered on Rad’s claim, together with Arnell’s failure to dispute that it would have received a substantially higher settlement on Rad’s (and its own) claim if it had been timely presented, was evidence that Arnell failed to take proper steps to preserve Rad’s claim. Accordingly, the court held that Rad’s recovery against Arnell could not be limited to the monies actually recovered from the City by Arnell, and that Rad was entitled to a trial on the issue of damages—a trial where it was free to introduce evidence of all damages that it incurred resulting from Arnell’s breach of the liquidating agreement.

Comment

Liquidating agreements are an effective way to address the problem of a sub’s lack of a contractual relationship with a GC by having that GC essentially admit the validity of the sub’s claims, confess liability on those claims, and then prosecute those claims on behalf of the sub with the promise that the recovery would be passed along to the aggrieved sub. The benefit to a sub is that claims which would otherwise be barred because of the lack of privity of contract with the owner can be adjudicated. The benefit to the GC is that its liability is limited to the amount it ultimately recovers on the liquidated claims. However, as we saw from the first Rad decision, in order to enjoy the protection of that limitation of liability, the GC must be diligent in prosecuting the sub’s liquidated claims. Further, as we saw from the second Rad decision, where it is established that a GC was not diligent in prosecuting its sub’s claims, the sub is not limited in the amount of damages it is entitled to prove to what ended up being recovered from the owner. Accordingly, GCs and prime contractors would be well advised to take their responsibilities under a liquidating agreement seriously or else be prepared to be held responsible for the entirety of the sub’s claims.

Contractor’s Delay Claim Survives Despite Failure to Provide Notice Required Under Contract

Contractual notice provisions are one of the biggest landmines that contractors face since the failure to strictly comply with such provisions can preclude recovery on otherwise valid claims. Further, notice provisions vary greatly from contract to contract. Additionally, contractors, being a practical lot, often focus on working to minimize or resolve the situation that led to the claim in the first place, sometimes to the detriment of complying with such notice requirements.

In the recent case of R-J Taylor General Contracting, Inc., v Fairport Central School District, an appellate court permitted a delay claim to survive despite the contractor’s clear failure to make its required notices under the contract.

Background

R-J Taylor General Contracting entered into two identical contracts with the Fairport Central School District for work at various schools within the district. These contracts included no-damages-for-delay provisions, and also provided specific time periods under which R-J Taylor had to notify the School District of any claims under the contract. R-J Taylor’s scope of work included, amongst other things, the removal of unsuitable soil. As to this work, R-J Taylor was to provide a unit price for such work undertaken above or below a set quantity.

During the course of its work, R-J Taylor exceeded the set quantity for soil removal. The School District refused to pay for the additional removal work, and R-J Taylor commenced a lawsuit to recover the amounts owed. In that lawsuit, R-J Taylor also sought damages related to the School District’s “unforeseeably excessive number of changes and corrections to the original contract documents.” It was agreed that these claims (one on each contract) actually sought damages for delay.

The School District moved for summary judgment dismissing R-J Taylor’s delay claims, arguing that they were barred by the no-damages-for-delay provisions. The School District also argued that regardless of the contractual bar, R-J Taylor failed to provide the requisite notice under the contracts.

Decision

The motion court denied the School District’s motion for summary judgment, and the appellate court affirmed the lower court’s holding. In doing so, the appellate court cited to well settled case law that no-damages-for-delay clauses are generally enforceable, but that exceptions exist where: (1) the delays are caused by the owner's bad faith or its willful, malicious, or grossly negligent conduct, (2) there are uncontemplated delays, (3) the delays are so unreasonable that they constitute an intentional abandonment of the contract by the owner, and (4) the delays result from the owner's breach of a fundamental obligation of the contract. Both courts held that there were questions of fact at to whether R-J Taylor could establish that one of the exceptions to a no-damages-for-delay provision existed.

As to the failure to comply with the contractual notice provisions, the appellate court held that such a failure generally constitutes a waiver of such claims. However, in light of the no-damages-for-delay provisions of the contracts, the delay claims were held to be outside of the contracts. As such, the delay claims were not subject to the notice provisions contained within the contracts, and were permitted to survive.

Comment

While R-J Taylor’s delay claim, as an extra-contractual claim, was permitted to survive notwithstanding the contractor’s failure to comply with the contractual notice provisions, contractors should not take this as holding that they need not comply with those notice provisions. Rather, the fact that the appellate court described the claim as one seeking relief wholly outside of the contract should serve as a warning that such situations are the rare exception, rather than the general rule. Clearly, had the notice provision in the contract read that notice had to be provided for “all claims”, and not just “all claims under the contract”, the outcome would have been different, and R-J Taylor’s delay claims would have met their end. The prudent course of action would have been for R-J Taylor to have provided its notices in accordance with the contracts, thus saving it from having to make an argument at to why its failure needed to be excused.

Contractor Loses Delay Claim for Delay Occurring Prior to Approval of Contract by State Comptroller

Section 112 of New York’s State Finance Law provides that no contract with the State which exceeds $50,000.00 is considered effective prior to its approval by the State Comptroller. This statute was enacted to prevent state employees from making improvident or extravagant contracts and from creating liabilities for which there was no appropriation. Section 112 has been held to apply to a wide variety of contracts, including construction contracts.

In the recent case of C&L Electric, Inc. v City University of New York, an appellate court used Section 112 of the State Finance Law to deny a contractor a recovery on that portion of a delay claim which pre-dated the State Comptroller’s approval and filing of the contract.

Background

In 2001, C&L Electric, Inc., was notified that it was the successful bidder on a project to install a fire alarm system throughout four buildings of the City University of New York’s1 New York City Technical College in Brooklyn. C&L went to work on the project at some time after May 3, 2002, the date on which C&L sent a notice to CUNY complaining of the long delay in awarding the contract. In 2007, C&L submitted a request for an extension of time from April 4, 2004 to December 31, 2007, citing, amongst other delays, the delay in the start of the project. This extension of time was approved, but with the caveat that CUNY was still evaluating the delay claim change order. Ultimately, C&L’s contract was terminated by CUNY for reasons unrelated to the delay claim, and C&L sued on its delay claim, among others.

Decision

The State moved for summary judgment dismissing C&L’s lawsuit on various grounds. As to the delay claim, the State argued that it was barred by the “no damages for delay” clause in the contract. The lower court denied the motion, finding that there were questions that had to be resolved by a jury as to whether the facts of this matter fit into one of the four categories where damages are permitted even in the face of a “no damages for delay” clause (delays resulting from bad faith or grossly negligent conduct on the part of the owner; uncontemplated delays; delays so unreasonable that they amount to an abandonment of the contract; and delays resulting from the breach of a fundamental obligation of the contract). The State appealed.

On appeal, the appellate court upheld the lower court’s finding that there was an issue to be resolved by a jury. However, that court modified the lower court’s order to apply Section 112 of the State Finance Law, holding that claims for any delays which arose prior to September 26, 2002, the date on which the contract was approved and filed by the State Comptroller, were subject to dismissal. The appellate court also rejected C&L’s argument that the parties’ course of conduct indicated a waiver of the statutory protection, citing to well established case law holding that “employees of a state agency cannot, through words or a course of conduct, bind the State to a contract that the Comptroller has not approved”.

Comment

As this case demonstrates, no rights exist under a contract which has not been approved by the State Comptroller, as that contract does not legally exist before such approval. While the State here did not make an issue of its obligation to make payment of the base contract balance for work performed prior to the contract’s acceptance date, there is case law that holds that because there is no legally existing contract, the State has no obligation to pay for such work either under a contract or an unjust enrichment theory.

While state agencies are often anxious to get their construction projects under way, and while they typically do not weaponize this statutory provision to disclaim the obligation to pay for work performed in good faith prior to the formal acceptance and filing of the contract, know that in the event that a litigated contract dispute arises this shield is available to the state. A contractor would be well advised to make inquiries with the state agency and the State Comptroller’s office as to the status of the Comptroller’s acceptance of the contract so that they can be sure that they are working under a valid and enforceable agreement.


1 The City University of New York is a part of the State University of New York system and, thus, a State, not a City, entity.

Court Enforces Sub’s Lien Claim Against Owner

New York’s Lien Law provides that contractors, subcontractors and material suppliers have the right to file a mechanic’s lien against the property improved upon.  Where public projects are involved (state, county, city and municipalities) a subcontractor or supplier can file a mechanic’s lien against the money due to the contractor from the public entity.

The lien rights of a subcontractor or supplier in either a private setting or a public improvement, however, are restricted to money due to the contractor from either the private owner or public entity.  The lien claim will be dismissed if no funds are owing to the general contractor.

In the recent case of C.C.C. Renovations, Inc. v Victoria Towers Development Corp., the appellate court affirmed the lower court’s decision that ruled in favor of the subcontractor on the critical issue of whether there was sufficient evidence to establish that there were funds due from the owner to the general contractor at the time of the filing of the subcontractor’s lien.

Background

Victoria Towers Development Corp. entered into a contract Blue Diamond Group for Blue Diamond to act as general contractor to make repairs at Victoria Towers’ property in Queens, which had been damaged in September of 2010. C.C.C. Renovations entered into four separate subcontract agreements with Blue Diamond to perform roofing, pipe scaffolding, electrical scaffolding, and sidewalk scaffolding work at the property. After the work was performed, C.C.C. remained unpaid under its subcontracts.  In November of 2011, C.C.C. filed two mechanic's liens against the property, seeking $59,500 for unpaid roofing work and $698,185 for unpaid sidewalk bridging, pipe, and electric scaffolding work. In January of 2012, Blue Diamond, as general contractor, filed its own mechanic's lien against the property, seeking $5,325,557 for unpaid work at the property. C.C.C. sued to foreclose its mechanic’s liens and, ultimately, moved for summary judgment.

Decision.

C.C.C. argued that it established both its right to recover for the subcontracted work that it performed, and that there was sufficient money owing to the general contractor, Blue Diamond, to cover the amounts of the liens. The lower court agreed and granted C.C.C. summary judgment. Victoria Towers appealed.  The appellate court affirmed the lower court’s decision.

In affirming the grant of summary judgment to the lienor-subcontractor, the appellate court relied on Section 3 of the Lien Law, and the case law interpreting that statute, holding that the mechanic’s lien remedy is limited by the principles of subrogation.  The subcontractor essentially steps into the shoes of the general contractor (in effect becoming “subrogated” to the general contractor’s claims against the owner), and those claims cannot exceed whatever claims the general contractor itself could assert against the owner.  If the general contractor is not owed any amount under its contract with the owner at the time the subcontractor's notice of lien is filed, then the subcontractor may not foreclose on its mechanic’s lien.

Here, however, the lower court found, and the appellate court affirmed, that C.C.C. established its entitlement to summary judgment because it established both the amounts owed for the work it performed at the property under the subcontracts, and that those amounts did not exceed the amount owed by the owner to the general contractor. The appellate court noted that Victoria Towers, in opposition, failed to demonstrate that a triable issue of fact existed to deny C.C.C. enforcement of its mechanic’s lien claim.

Comment

As this case demonstrates, the rights of subcontractor and material supplier lienors are derivative of the rights of the general contractor, and those rights are limited by the amount remaining due from the owner to the general contractor.  The subcontractors and suppliers cannot recover more than the amount owed from the owner to the general contractor.

A critical issue in the enforcement of liens is whether the owner had paid the general contractor in full at the time of the filing of the subcontractor’s or materialman’s lien.  Obviously, a mechanic’s lien filed without delay increases the likelihood that the lien will attach to monies due from the owner to the contractor.  The prudent subcontractor or material supplier should promptly file a mechanic’s lien once it becomes apparent that there is a problem with payment on the project.

Court Enforces Out-of-State Forum Selection Clause of Supply Contract

Contracts between parties frequently contain provisions specifying that litigation relating to the contract may be initiated only in a specified forum.  Courts generally enforce these forum selection clauses, and there is a high bar to challenge their enforceability.  In the recent case of Somerset Fine Homes Building, Inc. v Simplex Industries, Inc., a New York home builder challenged the validity of a sales agreement with a supplier which provided that any disputes would be litigated in a Court in Pennsylvania and determined by the law of Pennsylvania

Background

Somerset Fine Homes, a home builder in Suffolk County, entered into a sales agreement with Simplex Industries, a manufacturer of modular homes in Scranton, Pennsylvania, for Simplex to manufacture and transport a house to a site in Bridgehampton, New York, where Somerset was to erect the home for the homeowners. The agreement between Somerset and Simplex provided that any disputes would be determined by the law of Pennsylvania and that the exclusive forum for any action to enforce the agreement would be the Court of Common Pleas of Lackawanna County, Pennsylvania.

Somerset commenced a lawsuit against Simplex in Supreme Court in Suffolk County, claiming that Simplex breached the contract, breached the warranty, and committed fraud because it failed to deliver conforming, merchantable goods pursuant to the sales contract.  Simplex moved to dismiss the lawsuit, arguing that the parties’ agreement provides for the litigation of their dispute in the Pennsylvania court. In opposition to the motion, Somerset argued that the forum selection clause should be set aside as unconscionable, unreasonable and unjust, because it is a small company and traveling to Pennsylvania would cause it financial distress. In support of its argument, Somerset characterized itself as the weaker bargaining party and claimed it “had no choice” but to agree to the contract, as drafted by Simplex.

Decision

The court granted Simplex’s motion to dismiss, holding that parties to a contract may freely select their forum in the absence of unconscionability. The court, citing well established case law, held that a party claiming unconscionability bears a heavy burden of making a “strong showing” that the consenting party had no choice, and that the contract unreasonably favored the other party. According to the court, “the fact that the parties do not possess equal bargaining power does not invalidate a contract”. Moreover, the court noted that “the parties acknowledged in the agreement that they had the opportunity to obtain the assistance of counsel in the negotiation, drafting and execution of the agreement.” The court further ruled that simply claiming financial distress does not warrant setting aside a valid forum selection clause.  The court pointed out that there was no evidence that the cost of commencing an action in Pennsylvania would be “so financially prohibitive that for all practical purposes, [Somerset] would be deprived of its day in court”.  

Comment

It is well established that forum selection clauses are presumptively valid and enforceable.  To set aside a forum selection clause, the opposing party must show that enforcement of the clause is unreasonable, unjust or invalid due to fraud or overreaching.  This case demonstrates the high bar that a party must meet to convince the court that enforcement of a forum selection clause is unconscionable.

It must be noted that if this were a contract which required the performance of construction work in New York, the result would have been different by statute. Section 757 of the General Business Law specifically declares any attempt to change the venue of a construction contract dispute, or the law to be applied to such a dispute, void and unenforceable. Accordingly, in the construction context, forum selection clauses in New York are valid only with regard to supply contracts. For contracts which require any work, as opposed to contracts for the supply of goods only, the venue and choice of law will be in New York.

Landlord Liable to Contractor Where It Consented to the Work

The general rule is that a contractor who performed work for a tenant cannot file a mechanic’s lien on the real property unless the owner-landlord consents to the improvement. Such consent may be actual or implied. Generally, the owner must have indicated, through some affirmative act, a willingness to have the improvement made.

In the recent case of Ferrara v Peaches Café, LLC, decided by the Court of Appeals, consent was found in a lease which requires or permits a tenant to make improvements to the leased premises. Therefore, the court permitted the contractor to foreclose on the lien.

Background

COR Ridge Road Company, LLC owns commercial property that it leased to Peaches Café LLC, where Peaches intended to operate a restaurant. The written lease required Peaches to supply “[a]ll electrical work other than items furnished by [COR].” The lease further provided that Peaches could not commence construction work on the property without COR’s consent, and that Peaches could only use contractors approved by COR. Finally, the lease stated that any alterations, additions, or improvements to the premises “shall at once become a part of the realty and belong to [COR] and shall be surrendered with the Premises.”

Ferrara was retained by Peaches to perform the electrical work on the property, which it performed satisfactorily. Peaches failed to pay Ferrara, and Ferrara filed a mechanic’s lien against the property. Ferrara sued to foreclose on the lien.

Ferrara moved for summary judgment on its lien foreclosure cause of action, and COR moved for summary judgment dismissing that claim. COR argued that it did not have any dealings with the contractor and did not “expressly” or “directly” consent to the performance of the work. According to COR, liability could not be imposed on the owner for the debts of the tenant.  The trial court granted COR’s motion and dismissed the contractor’s foreclosure action.  Ferrara appealed.

Appellate Decisions

On appeal, Ferrara argued that Section 3 of the Lien Law permits a contractor to file a lien for improvements made with the consent of the owner, and that COR consented to the work set forth in the lease, which required Peaches to make certain alterations to the rented space. The Appellate Division reversed the trial court’s decision and granted Ferrara summary judgment against COR, relying upon well settled case law which holds that the landlord’s consent need not be specifically granted, but can also be implied from the terms of a tenant’s lease. Here, the requirement in the lease that Peaches make certain improvements is sufficient to imply the owner’s consent. The Appellate Division also rejected COR’s argument that a clause in the lease that disclaims liability for any mechanic’s lien arising as a result of work by Peaches extinguishes the Owner’s liability for the lien. The court found that the disclaimer provision was merely an indemnification clause meant for Peaches to ultimately repay COR for any monies COR had to pay out to a lienor. COR appealed to the Court of Appeals.

The Court of Appeals affirmed the decision of the Appellate Division, rejecting COR’s argument that a direct relationship between the landlord and the contractor was necessary to impose liability on the landlord. The Court noted that Peaches not only was obligated to make improvements, but COR also retained supervision over the work in the form of a veto over the contractor chosen and Peaches’ proposed plans. Based on these facts and well settled case law, the Court of Appeals found that the owner’s implied consent for the improvement, as spelled out in the lease, is sufficient to establish COR’s consent to the improvement.

Comment

Although the interpretation of what constitutes an owner’s implied consent to an improvement is a fact-based determination that will vary from case to case, it does not require a direct relationship between the owner-landlord and the lienor contractor. All that is required is that the owner either had taken an affirmative act or a course of conduct establishing such consent.  Here, the lease obligated the tenant to make specific improvements to the property. This “affirmative act” was sufficient to establish the owner’s consent to the work performed under the lease so as to allow the contractor to enforce the lien as against the property owner.

Court Interprets Conflicting Contract Provisions in Favor of Subcontractor

Cases involving conflicting provisions in a contract are some of the most commonly litigated contract disputes. Where there are competing provisions in a contract, the court must identify the actual intent of the parties to determine which provision is the controlling language. In the case of Matter of Sciame Construction, LLC v Re:Source New Jersey, Inc., the court interpreted a subcontract which contained inconsistent provisions, one in the body of the subcontract and the other in the riders or exhibits to the subcontract.

Background

Sciame Construction, LLC, was the general contractor for a construction project on Laight Street in Manhattan. Sciame entered into a subcontract with Re:Source New Jersey, as a subcontractor, on September 9, 2013. The subcontract signed by the parties was an AIA form prepared with a computer program. Article 6 of the subcontract, under “Mediation and Binding Dispute Resolution” requires the parties to manually check a box in Article 6.2 to indicate how the parties agreed to resolve disputes. There is an option to resolve disputes via arbitration; that box is checked. Likewise, there is an option to resolve disputes through litigation in a court; that box is not checked.

Attached to the subcontract as Exhibits A and B were pre-printed riders that were not negotiated by the parties and were not signed by anyone from Re:Source, nor did the exhibits name or make any reference to Re:Source.  These riders made reference to litigation as the method of dispute resolution, and provided for the dispute to be litigated in the New York State Supreme Court or Federal District Court in Manhattan as the means to resolve disputes.

Re:Source claimed that it was owed payments for work performed at the Laight Street Project, and it initiated mediation and arbitration proceedings with the AAA.  Sciame petitioned the court to permanently stay the arbitration commenced by Re:Source, arguing that the exhibits to the subcontract designate litigation as the exclusive means of dispute resolution. The lower court dismissed Sciame’s petition to stay the arbitration. The court held that the provision in the subcontract, which requires the parties to arbitrate, controls, and the parties must arbitrate their dispute. Sciame appealed.  

Decision

The appellate court affirmed the lower court’s decision, holding that the typewritten terms of the subcontract regarding binding arbitration of disputes “represents an express manifestation of the parties’ actual intentions and take precedence over any inconsistent provisions in the printed form[s]”.  The court pointed out that the conflicting provisions in the exhibits is, by its plain terms, inapplicable to the parties subcontract; “to construe it otherwise would impermissibly rewrite the provision under the guise of contract construction.”

Comment

Parties are free to negotiate and incorporate many different provisions into their contracts, and unless these provisions violate law or public policy they will generally be enforced. An obstacle to enforcement is where there are conflicting provisions in a contract, leaving the courts with the unenviable task of deciding the meaning of the contract.  This decision underscores the importance to contractors and subcontractors of carefully reviewing the proposed contract language and seeking clarification or modification to ensure that the contract reflects the true intent of the parties.  

Corporate Owner Personally Liable for Fraudulent Transfers of Money

New York’s Debtor and Creditor Law prohibits the transfer of assets in an attempt to evade creditors. A corporate representative who participated in the fraudulent transfer may be held personally liable, regardless of whether the representative acted on behalf of the corporation in the course of his official duties.

In the case of Eastern Concrete Materials, Inc. v Allstar Ready Mix Corp., et. al., the court addressed the issue of personal liability by a 50% corporate shareholder for participating in fraudulent transfers of money.  The transfers were intended to evade enforcement of a judgment against a corporate ready-mix concrete supplier.

Background

In September of 2014, petitioner Eastern Concrete Materials, Inc. obtained a default judgment against Allstar Ready Mix Corp., in the amount of $82,739.40. Allstar was 50% owned by respondent Dominick P. Frantelizzi (“Dominick P.”), who also owned respondent City View Contracting Corp.  His son, Dominick M. Frantellizzi, owned Transit Mix Corp. and his father, Dominick Frantellizzi, Sr., owed DF, LLC.  These companies, including Allstar, maintained bank accounts at Chase Bank, and Dominick P. was a signatory on all of the accounts.  Transit Mix was formed one month after the judgment was entered against Allstar.  All of these entities were located at the same address as Allstar.  Within days after the judgment was entered, Allstar transferred a total of $82,850.00 to City View, Transit Mix, and DF, LLC.  

Based on these facts, Eastern moved for summary judgment against all respondents in the amount of $38,988.48, the amount left outstanding on the Allstar judgment, plus attorney’s fees, claiming that the money transfers out of Allstar’s bank accounts into other entities that either Dominick P. or a close family member controlled, were fraudulent acts intended to defeat Eastern’s right to enforce the judgment entered against Allstar.

Decision

New York’s Debtor and Creditor law protects judgment creditors from attempts by judgment debtors to frustrate collection of judgments.  The law provides that any transfer undertaken with the intent to hinder, delay or defraud creditors is fraudulent and, therefore, void. The “badges of fraud” which evidence that intention include a close relationship between the parties to the transaction, the inadequacy of consideration for the money transfers, the transferor’s knowledge of the claims and its inability to pay them, and the effective retention of the property after the transfer. The law also provides that all transfers made without fair consideration by a defendant or a judgment debtor are per se fraudulent.

The court granted summary judgment to Eastern against Allstar, Transit Mix and Dominick P. for the full remaining amount of the judgment, plus $42,875.91 in attorney’s fees. In doing so, the court focused on the post-judgment transfer of money without consideration after Allstar ceased doing business and for no apparent purpose, the overlapping common control of the companies, the close family members’ disregard of separate corporate identities, and their existence at the same location.  

In its judgment, the court pierced the corporate veil of the corporate entities to impose liability upon Dominick P. personally.  His actions in undertaking the fraudulent transfers, failing to respect separate corporate identities, and in gifting Allstar’s assets to his son were found to be evidence of fraud sufficient to hold him personally liable for the full amount of the judgment.

Finally, the Debtor and Creditor law provides for an award of attorney’s fees where the fraudulent transfers demonstrate “actual intent”. The court held that Dominick P. and the corporate respondents failed to prove any legitimate purposes for these transfers.  Under the circumstances, the court found there was actual intent to defraud.  Therefore the court awarded attorney’s fees and costs to Eastern.

Comment

The Debtor and Creditor Law is a powerful tool for creditors to use against debtors who seek to frustrate enforcement of judgments.  Here the court did not hesitate to declare the money transfers null and void and award attorney’s fees—which exceeded the principal amount of the judgment.  Courts will pierce the corporate veil between corporations and individuals and hold corporate representatives personally liable for fraudulent transfers designed to evade the collection of a money judgment.